Simultaneous lot-sizing and scheduling with recovery options: problem formulation and analysis of the single-product case
- Autores
- Piñeyro, Pedro; Rossit, Daniel Alejandro
- Año de publicación
- 2021
- Idioma
- inglés
- Tipo de recurso
- documento de conferencia
- Estado
- versión publicada
- Descripción
- We address an extension of the discrete lot-sizing and scheduling problem in which the demand of products can be also satisfied by remanufacturing used products returned to the origin. A mixed-integer linear programming formulation is provided for the problem, assuming dynamic demand and returns values, and time-invariant costs of setup and holding inventory. We then present a numerical experimentation carried out with the mathematical model for the case of a single product, in order to evaluate the efficiency in both costs and solving times compared to the traditional problem without returns. From the results obtained we conclude that the problem with recovery options can lead to economic benefits only under certain assumptions on the costs and amounts of returns. In addition, according to the runtimes obtained for large instances of the problem, it seems to be much more difficult to solve than its traditional version without returns.
Fil: Piñeyro, Pedro. Universidad de la República; Uruguay
Fil: Rossit, Daniel Alejandro. Consejo Nacional de Investigaciones Científicas y Técnicas. Centro Científico Tecnológico Conicet - Bahía Blanca. Instituto de Matemática Bahía Blanca. Universidad Nacional del Sur. Departamento de Matemática. Instituto de Matemática Bahía Blanca; Argentina. Universidad Nacional del Sur. Departamento de Ingeniería; Argentina
International Conference of Production Research-Americas
Bahía Blanca
Argentina
Universidad Nacional del Sur - Materia
-
LOT-SIZING
SCHEDULING
REMANUFACTURING
MATHEMATICAL PROGRAMMING
OPTIMIZATION - Nivel de accesibilidad
- acceso abierto
- Condiciones de uso
- https://creativecommons.org/licenses/by-nc-sa/2.5/ar/
- Repositorio
- Institución
- Consejo Nacional de Investigaciones Científicas y Técnicas
- OAI Identificador
- oai:ri.conicet.gov.ar:11336/153451
Ver los metadatos del registro completo
id |
CONICETDig_c235ab9ac6f13e3d34c357fe6b38bff2 |
---|---|
oai_identifier_str |
oai:ri.conicet.gov.ar:11336/153451 |
network_acronym_str |
CONICETDig |
repository_id_str |
3498 |
network_name_str |
CONICET Digital (CONICET) |
spelling |
Simultaneous lot-sizing and scheduling with recovery options: problem formulation and analysis of the single-product casePiñeyro, PedroRossit, Daniel AlejandroLOT-SIZINGSCHEDULINGREMANUFACTURINGMATHEMATICAL PROGRAMMINGOPTIMIZATIONhttps://purl.org/becyt/ford/2.11https://purl.org/becyt/ford/2We address an extension of the discrete lot-sizing and scheduling problem in which the demand of products can be also satisfied by remanufacturing used products returned to the origin. A mixed-integer linear programming formulation is provided for the problem, assuming dynamic demand and returns values, and time-invariant costs of setup and holding inventory. We then present a numerical experimentation carried out with the mathematical model for the case of a single product, in order to evaluate the efficiency in both costs and solving times compared to the traditional problem without returns. From the results obtained we conclude that the problem with recovery options can lead to economic benefits only under certain assumptions on the costs and amounts of returns. In addition, according to the runtimes obtained for large instances of the problem, it seems to be much more difficult to solve than its traditional version without returns.Fil: Piñeyro, Pedro. Universidad de la República; UruguayFil: Rossit, Daniel Alejandro. Consejo Nacional de Investigaciones Científicas y Técnicas. Centro Científico Tecnológico Conicet - Bahía Blanca. Instituto de Matemática Bahía Blanca. Universidad Nacional del Sur. Departamento de Matemática. Instituto de Matemática Bahía Blanca; Argentina. Universidad Nacional del Sur. Departamento de Ingeniería; ArgentinaInternational Conference of Production Research-AmericasBahía BlancaArgentinaUniversidad Nacional del SurUniversidad Nacional del Sur2021info:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/conferenceObjectConferenciaJournalhttp://purl.org/coar/resource_type/c_5794info:ar-repo/semantics/documentoDeConferenciaapplication/pdfapplication/pdfapplication/pdfhttp://hdl.handle.net/11336/153451Simultaneous lot-sizing and scheduling with recovery options: problem formulation and analysis of the single-product case; International Conference of Production Research-Americas; Bahía Blanca; Argentina; 2020; 2837-28492619-1865CONICET DigitalCONICETenginfo:eu-repo/semantics/altIdentifier/url/https://www.matematica.uns.edu.ar/ipcra/pdf/icpr_americas_2020_proceedings.pdfInternacionalinfo:eu-repo/semantics/openAccesshttps://creativecommons.org/licenses/by-nc-sa/2.5/ar/reponame:CONICET Digital (CONICET)instname:Consejo Nacional de Investigaciones Científicas y Técnicas2025-09-03T09:54:39Zoai:ri.conicet.gov.ar:11336/153451instacron:CONICETInstitucionalhttp://ri.conicet.gov.ar/Organismo científico-tecnológicoNo correspondehttp://ri.conicet.gov.ar/oai/requestdasensio@conicet.gov.ar; lcarlino@conicet.gov.arArgentinaNo correspondeNo correspondeNo correspondeopendoar:34982025-09-03 09:54:39.343CONICET Digital (CONICET) - Consejo Nacional de Investigaciones Científicas y Técnicasfalse |
dc.title.none.fl_str_mv |
Simultaneous lot-sizing and scheduling with recovery options: problem formulation and analysis of the single-product case |
title |
Simultaneous lot-sizing and scheduling with recovery options: problem formulation and analysis of the single-product case |
spellingShingle |
Simultaneous lot-sizing and scheduling with recovery options: problem formulation and analysis of the single-product case Piñeyro, Pedro LOT-SIZING SCHEDULING REMANUFACTURING MATHEMATICAL PROGRAMMING OPTIMIZATION |
title_short |
Simultaneous lot-sizing and scheduling with recovery options: problem formulation and analysis of the single-product case |
title_full |
Simultaneous lot-sizing and scheduling with recovery options: problem formulation and analysis of the single-product case |
title_fullStr |
Simultaneous lot-sizing and scheduling with recovery options: problem formulation and analysis of the single-product case |
title_full_unstemmed |
Simultaneous lot-sizing and scheduling with recovery options: problem formulation and analysis of the single-product case |
title_sort |
Simultaneous lot-sizing and scheduling with recovery options: problem formulation and analysis of the single-product case |
dc.creator.none.fl_str_mv |
Piñeyro, Pedro Rossit, Daniel Alejandro |
author |
Piñeyro, Pedro |
author_facet |
Piñeyro, Pedro Rossit, Daniel Alejandro |
author_role |
author |
author2 |
Rossit, Daniel Alejandro |
author2_role |
author |
dc.subject.none.fl_str_mv |
LOT-SIZING SCHEDULING REMANUFACTURING MATHEMATICAL PROGRAMMING OPTIMIZATION |
topic |
LOT-SIZING SCHEDULING REMANUFACTURING MATHEMATICAL PROGRAMMING OPTIMIZATION |
purl_subject.fl_str_mv |
https://purl.org/becyt/ford/2.11 https://purl.org/becyt/ford/2 |
dc.description.none.fl_txt_mv |
We address an extension of the discrete lot-sizing and scheduling problem in which the demand of products can be also satisfied by remanufacturing used products returned to the origin. A mixed-integer linear programming formulation is provided for the problem, assuming dynamic demand and returns values, and time-invariant costs of setup and holding inventory. We then present a numerical experimentation carried out with the mathematical model for the case of a single product, in order to evaluate the efficiency in both costs and solving times compared to the traditional problem without returns. From the results obtained we conclude that the problem with recovery options can lead to economic benefits only under certain assumptions on the costs and amounts of returns. In addition, according to the runtimes obtained for large instances of the problem, it seems to be much more difficult to solve than its traditional version without returns. Fil: Piñeyro, Pedro. Universidad de la República; Uruguay Fil: Rossit, Daniel Alejandro. Consejo Nacional de Investigaciones Científicas y Técnicas. Centro Científico Tecnológico Conicet - Bahía Blanca. Instituto de Matemática Bahía Blanca. Universidad Nacional del Sur. Departamento de Matemática. Instituto de Matemática Bahía Blanca; Argentina. Universidad Nacional del Sur. Departamento de Ingeniería; Argentina International Conference of Production Research-Americas Bahía Blanca Argentina Universidad Nacional del Sur |
description |
We address an extension of the discrete lot-sizing and scheduling problem in which the demand of products can be also satisfied by remanufacturing used products returned to the origin. A mixed-integer linear programming formulation is provided for the problem, assuming dynamic demand and returns values, and time-invariant costs of setup and holding inventory. We then present a numerical experimentation carried out with the mathematical model for the case of a single product, in order to evaluate the efficiency in both costs and solving times compared to the traditional problem without returns. From the results obtained we conclude that the problem with recovery options can lead to economic benefits only under certain assumptions on the costs and amounts of returns. In addition, according to the runtimes obtained for large instances of the problem, it seems to be much more difficult to solve than its traditional version without returns. |
publishDate |
2021 |
dc.date.none.fl_str_mv |
2021 |
dc.type.none.fl_str_mv |
info:eu-repo/semantics/publishedVersion info:eu-repo/semantics/conferenceObject Conferencia Journal http://purl.org/coar/resource_type/c_5794 info:ar-repo/semantics/documentoDeConferencia |
status_str |
publishedVersion |
format |
conferenceObject |
dc.identifier.none.fl_str_mv |
http://hdl.handle.net/11336/153451 Simultaneous lot-sizing and scheduling with recovery options: problem formulation and analysis of the single-product case; International Conference of Production Research-Americas; Bahía Blanca; Argentina; 2020; 2837-2849 2619-1865 CONICET Digital CONICET |
url |
http://hdl.handle.net/11336/153451 |
identifier_str_mv |
Simultaneous lot-sizing and scheduling with recovery options: problem formulation and analysis of the single-product case; International Conference of Production Research-Americas; Bahía Blanca; Argentina; 2020; 2837-2849 2619-1865 CONICET Digital CONICET |
dc.language.none.fl_str_mv |
eng |
language |
eng |
dc.relation.none.fl_str_mv |
info:eu-repo/semantics/altIdentifier/url/https://www.matematica.uns.edu.ar/ipcra/pdf/icpr_americas_2020_proceedings.pdf |
dc.rights.none.fl_str_mv |
info:eu-repo/semantics/openAccess https://creativecommons.org/licenses/by-nc-sa/2.5/ar/ |
eu_rights_str_mv |
openAccess |
rights_invalid_str_mv |
https://creativecommons.org/licenses/by-nc-sa/2.5/ar/ |
dc.format.none.fl_str_mv |
application/pdf application/pdf application/pdf |
dc.coverage.none.fl_str_mv |
Internacional |
dc.publisher.none.fl_str_mv |
Universidad Nacional del Sur |
publisher.none.fl_str_mv |
Universidad Nacional del Sur |
dc.source.none.fl_str_mv |
reponame:CONICET Digital (CONICET) instname:Consejo Nacional de Investigaciones Científicas y Técnicas |
reponame_str |
CONICET Digital (CONICET) |
collection |
CONICET Digital (CONICET) |
instname_str |
Consejo Nacional de Investigaciones Científicas y Técnicas |
repository.name.fl_str_mv |
CONICET Digital (CONICET) - Consejo Nacional de Investigaciones Científicas y Técnicas |
repository.mail.fl_str_mv |
dasensio@conicet.gov.ar; lcarlino@conicet.gov.ar |
_version_ |
1842269298066718720 |
score |
13.13397 |