In recognition of a renewed interest in transmission voltages exceeding those in common usage today, SC A3 established WG A3.22 Technical Requirements for Substation Equipment exceeding 800 kV. The WG was tasked with reviewing the worldwide state-of-theart technical specifications for substation equipment rated at 800 kV, establishing the technical background for these specifications and making recommendations for the future standardization of Ultra High Voltage (UHV) substation equipment. A total of 39 international experts from 17 countries participated in these investigations and have produced a comprehensive survey of the state-of-the-art as presented in TB No. 362. The TB gives an overview of the characteristics of todays highest voltage systems in common use (735 to 800 kV) and of the various UHV projects around the world. Technical phenomena and technical specifications are compared and conclusions drawn regarding those areas which are well defined and those where further, more detailed, investigation is required before effective standardization can be achieved.
Fil: Ito, H.. Tepco (tokio Electric Power Company); Japón
Fil: Jenssen, A.. Kema; Países Bajos
Fil: Colombo, E. Cesi; Italia
Fil: Diaz, Ricardo Ruben. Universidad Nacional de Tucumán. Facultad de Ciencias Exactas y Tecnología. Instituto de Alta Tensión y Transmisión de Energía; Argentina. Consejo Nacional de Investigaciones Científicas y Técnicas. Centro Científico Tecnológico Conicet - Tucumán; Argentina
Materia
Ultra High Voltage
Power Transmission
Equipment
Standard
Nivel de accesibilidad
acceso abierto
Condiciones de uso
https://creativecommons.org/licenses/by-nc-sa/2.5/ar/
Repositorio
CONICET Digital (CONICET)
Institución
Consejo Nacional de Investigaciones Científicas y Técnicas
OAI Identificador
oai:ri.conicet.gov.ar:11336/81975

id CONICETDig_51b6720a1e107d5ced53c6ba9141ffa9
oai_identifier_str oai:ri.conicet.gov.ar:11336/81975
network_acronym_str CONICETDig
repository_id_str 3498
network_name_str CONICET Digital (CONICET)
spelling Technical requirements for substation equipmentIto, H.Jenssen, A.Colombo, EDiaz, Ricardo RubenUltra High VoltagePower TransmissionEquipmentStandardhttps://purl.org/becyt/ford/2.2https://purl.org/becyt/ford/2In recognition of a renewed interest in transmission voltages exceeding those in common usage today, SC A3 established WG A3.22 Technical Requirements for Substation Equipment exceeding 800 kV. The WG was tasked with reviewing the worldwide state-of-theart technical specifications for substation equipment rated at 800 kV, establishing the technical background for these specifications and making recommendations for the future standardization of Ultra High Voltage (UHV) substation equipment. A total of 39 international experts from 17 countries participated in these investigations and have produced a comprehensive survey of the state-of-the-art as presented in TB No. 362. The TB gives an overview of the characteristics of todays highest voltage systems in common use (735 to 800 kV) and of the various UHV projects around the world. Technical phenomena and technical specifications are compared and conclusions drawn regarding those areas which are well defined and those where further, more detailed, investigation is required before effective standardization can be achieved.Fil: Ito, H.. Tepco (tokio Electric Power Company); JapónFil: Jenssen, A.. Kema; Países BajosFil: Colombo, E. Cesi; ItaliaFil: Diaz, Ricardo Ruben. Universidad Nacional de Tucumán. Facultad de Ciencias Exactas y Tecnología. Instituto de Alta Tensión y Transmisión de Energía; Argentina. Consejo Nacional de Investigaciones Científicas y Técnicas. Centro Científico Tecnológico Conicet - Tucumán; ArgentinaCIGRE2008-12info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionhttp://purl.org/coar/resource_type/c_6501info:ar-repo/semantics/articuloapplication/pdfapplication/pdfhttp://hdl.handle.net/11336/81975Ito, H.; Jenssen, A.; Colombo, E; Diaz, Ricardo Ruben; Technical requirements for substation equipment; CIGRE; Electra; 241; 12-2008; 25-331519-793XCONICET DigitalCONICETenginfo:eu-repo/semantics/openAccesshttps://creativecommons.org/licenses/by-nc-sa/2.5/ar/reponame:CONICET Digital (CONICET)instname:Consejo Nacional de Investigaciones Científicas y Técnicas2025-09-03T09:47:00Zoai:ri.conicet.gov.ar:11336/81975instacron:CONICETInstitucionalhttp://ri.conicet.gov.ar/Organismo científico-tecnológicoNo correspondehttp://ri.conicet.gov.ar/oai/requestdasensio@conicet.gov.ar; lcarlino@conicet.gov.arArgentinaNo correspondeNo correspondeNo correspondeopendoar:34982025-09-03 09:47:00.606CONICET Digital (CONICET) - Consejo Nacional de Investigaciones Científicas y Técnicasfalse
dc.title.none.fl_str_mv Technical requirements for substation equipment
title Technical requirements for substation equipment
spellingShingle Technical requirements for substation equipment
Ito, H.
Ultra High Voltage
Power Transmission
Equipment
Standard
title_short Technical requirements for substation equipment
title_full Technical requirements for substation equipment
title_fullStr Technical requirements for substation equipment
title_full_unstemmed Technical requirements for substation equipment
title_sort Technical requirements for substation equipment
dc.creator.none.fl_str_mv Ito, H.
Jenssen, A.
Colombo, E
Diaz, Ricardo Ruben
author Ito, H.
author_facet Ito, H.
Jenssen, A.
Colombo, E
Diaz, Ricardo Ruben
author_role author
author2 Jenssen, A.
Colombo, E
Diaz, Ricardo Ruben
author2_role author
author
author
dc.subject.none.fl_str_mv Ultra High Voltage
Power Transmission
Equipment
Standard
topic Ultra High Voltage
Power Transmission
Equipment
Standard
purl_subject.fl_str_mv https://purl.org/becyt/ford/2.2
https://purl.org/becyt/ford/2
dc.description.none.fl_txt_mv In recognition of a renewed interest in transmission voltages exceeding those in common usage today, SC A3 established WG A3.22 Technical Requirements for Substation Equipment exceeding 800 kV. The WG was tasked with reviewing the worldwide state-of-theart technical specifications for substation equipment rated at 800 kV, establishing the technical background for these specifications and making recommendations for the future standardization of Ultra High Voltage (UHV) substation equipment. A total of 39 international experts from 17 countries participated in these investigations and have produced a comprehensive survey of the state-of-the-art as presented in TB No. 362. The TB gives an overview of the characteristics of todays highest voltage systems in common use (735 to 800 kV) and of the various UHV projects around the world. Technical phenomena and technical specifications are compared and conclusions drawn regarding those areas which are well defined and those where further, more detailed, investigation is required before effective standardization can be achieved.
Fil: Ito, H.. Tepco (tokio Electric Power Company); Japón
Fil: Jenssen, A.. Kema; Países Bajos
Fil: Colombo, E. Cesi; Italia
Fil: Diaz, Ricardo Ruben. Universidad Nacional de Tucumán. Facultad de Ciencias Exactas y Tecnología. Instituto de Alta Tensión y Transmisión de Energía; Argentina. Consejo Nacional de Investigaciones Científicas y Técnicas. Centro Científico Tecnológico Conicet - Tucumán; Argentina
description In recognition of a renewed interest in transmission voltages exceeding those in common usage today, SC A3 established WG A3.22 Technical Requirements for Substation Equipment exceeding 800 kV. The WG was tasked with reviewing the worldwide state-of-theart technical specifications for substation equipment rated at 800 kV, establishing the technical background for these specifications and making recommendations for the future standardization of Ultra High Voltage (UHV) substation equipment. A total of 39 international experts from 17 countries participated in these investigations and have produced a comprehensive survey of the state-of-the-art as presented in TB No. 362. The TB gives an overview of the characteristics of todays highest voltage systems in common use (735 to 800 kV) and of the various UHV projects around the world. Technical phenomena and technical specifications are compared and conclusions drawn regarding those areas which are well defined and those where further, more detailed, investigation is required before effective standardization can be achieved.
publishDate 2008
dc.date.none.fl_str_mv 2008-12
dc.type.none.fl_str_mv info:eu-repo/semantics/article
info:eu-repo/semantics/publishedVersion
http://purl.org/coar/resource_type/c_6501
info:ar-repo/semantics/articulo
format article
status_str publishedVersion
dc.identifier.none.fl_str_mv http://hdl.handle.net/11336/81975
Ito, H.; Jenssen, A.; Colombo, E; Diaz, Ricardo Ruben; Technical requirements for substation equipment; CIGRE; Electra; 241; 12-2008; 25-33
1519-793X
CONICET Digital
CONICET
url http://hdl.handle.net/11336/81975
identifier_str_mv Ito, H.; Jenssen, A.; Colombo, E; Diaz, Ricardo Ruben; Technical requirements for substation equipment; CIGRE; Electra; 241; 12-2008; 25-33
1519-793X
CONICET Digital
CONICET
dc.language.none.fl_str_mv eng
language eng
dc.rights.none.fl_str_mv info:eu-repo/semantics/openAccess
https://creativecommons.org/licenses/by-nc-sa/2.5/ar/
eu_rights_str_mv openAccess
rights_invalid_str_mv https://creativecommons.org/licenses/by-nc-sa/2.5/ar/
dc.format.none.fl_str_mv application/pdf
application/pdf
dc.publisher.none.fl_str_mv CIGRE
publisher.none.fl_str_mv CIGRE
dc.source.none.fl_str_mv reponame:CONICET Digital (CONICET)
instname:Consejo Nacional de Investigaciones Científicas y Técnicas
reponame_str CONICET Digital (CONICET)
collection CONICET Digital (CONICET)
instname_str Consejo Nacional de Investigaciones Científicas y Técnicas
repository.name.fl_str_mv CONICET Digital (CONICET) - Consejo Nacional de Investigaciones Científicas y Técnicas
repository.mail.fl_str_mv dasensio@conicet.gov.ar; lcarlino@conicet.gov.ar
_version_ 1842268830550720512
score 13.13397