Since 1997 Utilities in Argentina have been required by the Regulatory Authority (Ente Nacional Regulador de la Electricidad - ENRE) to carry out severe monitoring programs. These monitoring programs involve measuring both voltage level and disturbances - harmonics and flicker - in different points of their networks. There are regulations related to these monitoring programs which set the rules to be followed by the Utilities. Such regulations include the limits that must be fulfilled. As regards disturbances measurements, if the values measured in voltage are above the limits established Utilities are fined. One the other hand, Utilities are able to explore their networks in order to search for disturbing customers. In addition, Utilities are also able to fine customers as long as it is correctly proved that such disturbances are caused by them. Most procedures currently employed to decide whether the disturbances measured at a generic Point of Coupling (PC) are produced by the customer or by the Utility are difficult to carry out in practical cases. The aim of this paper is to analyse and criticise these procedures and propose new, more simplistic methods to assess responsibilities for disturbances. These are related to other methods also applied to different procedures regarding Liberalized Electricity Markets.
Instituto de Investigaciones Tecnológicas para Redes y Equipos Eléctricos (IITREE)
Materia
Ingeniería
industria eléctrica
energía eléctrica
suministro de energía eléctrica
Nivel de accesibilidad
acceso abierto
Condiciones de uso
http://creativecommons.org/licenses/by/3.0/
Repositorio
SEDICI (UNLP)
Institución
Universidad Nacional de La Plata
OAI Identificador
oai:sedici.unlp.edu.ar:10915/44675

id SEDICI_c11636106161aceb57209bf9bf892520
oai_identifier_str oai:sedici.unlp.edu.ar:10915/44675
network_acronym_str SEDICI
repository_id_str 1329
network_name_str SEDICI (UNLP)
spelling Criteria for the assignment of responsibilities for disturbances between utility and load in distribution networksIssouribehere, PedroBarbera, Gustavo ArielIngenieríaindustria eléctricaenergía eléctricasuministro de energía eléctricaSince 1997 Utilities in Argentina have been required by the Regulatory Authority (Ente Nacional Regulador de la Electricidad - ENRE) to carry out severe monitoring programs. These monitoring programs involve measuring both voltage level and disturbances - harmonics and flicker - in different points of their networks. There are regulations related to these monitoring programs which set the rules to be followed by the Utilities. Such regulations include the limits that must be fulfilled. As regards disturbances measurements, if the values measured in voltage are above the limits established Utilities are fined. One the other hand, Utilities are able to explore their networks in order to search for disturbing customers. In addition, Utilities are also able to fine customers as long as it is correctly proved that such disturbances are caused by them. Most procedures currently employed to decide whether the disturbances measured at a generic Point of Coupling (PC) are produced by the customer or by the Utility are difficult to carry out in practical cases. The aim of this paper is to analyse and criticise these procedures and propose new, more simplistic methods to assess responsibilities for disturbances. These are related to other methods also applied to different procedures regarding Liberalized Electricity Markets.Instituto de Investigaciones Tecnológicas para Redes y Equipos Eléctricos (IITREE)2005-06info:eu-repo/semantics/conferenceObjectinfo:eu-repo/semantics/publishedVersionObjeto de conferenciahttp://purl.org/coar/resource_type/c_5794info:ar-repo/semantics/documentoDeConferenciaapplication/pdfhttp://sedici.unlp.edu.ar/handle/10915/44675enginfo:eu-repo/semantics/altIdentifier/url/https://app.box.com/s/zmrxj95olbs4ltsqks0kmk1oxrz5hr4zinfo:eu-repo/semantics/openAccesshttp://creativecommons.org/licenses/by/3.0/Creative Commons Attribution 3.0 Unported (CC BY 3.0)reponame:SEDICI (UNLP)instname:Universidad Nacional de La Platainstacron:UNLP2025-09-03T10:34:50Zoai:sedici.unlp.edu.ar:10915/44675Institucionalhttp://sedici.unlp.edu.ar/Universidad públicaNo correspondehttp://sedici.unlp.edu.ar/oai/snrdalira@sedici.unlp.edu.arArgentinaNo correspondeNo correspondeNo correspondeopendoar:13292025-09-03 10:34:50.506SEDICI (UNLP) - Universidad Nacional de La Platafalse
dc.title.none.fl_str_mv Criteria for the assignment of responsibilities for disturbances between utility and load in distribution networks
title Criteria for the assignment of responsibilities for disturbances between utility and load in distribution networks
spellingShingle Criteria for the assignment of responsibilities for disturbances between utility and load in distribution networks
Issouribehere, Pedro
Ingeniería
industria eléctrica
energía eléctrica
suministro de energía eléctrica
title_short Criteria for the assignment of responsibilities for disturbances between utility and load in distribution networks
title_full Criteria for the assignment of responsibilities for disturbances between utility and load in distribution networks
title_fullStr Criteria for the assignment of responsibilities for disturbances between utility and load in distribution networks
title_full_unstemmed Criteria for the assignment of responsibilities for disturbances between utility and load in distribution networks
title_sort Criteria for the assignment of responsibilities for disturbances between utility and load in distribution networks
dc.creator.none.fl_str_mv Issouribehere, Pedro
Barbera, Gustavo Ariel
author Issouribehere, Pedro
author_facet Issouribehere, Pedro
Barbera, Gustavo Ariel
author_role author
author2 Barbera, Gustavo Ariel
author2_role author
dc.subject.none.fl_str_mv Ingeniería
industria eléctrica
energía eléctrica
suministro de energía eléctrica
topic Ingeniería
industria eléctrica
energía eléctrica
suministro de energía eléctrica
dc.description.none.fl_txt_mv Since 1997 Utilities in Argentina have been required by the Regulatory Authority (Ente Nacional Regulador de la Electricidad - ENRE) to carry out severe monitoring programs. These monitoring programs involve measuring both voltage level and disturbances - harmonics and flicker - in different points of their networks. There are regulations related to these monitoring programs which set the rules to be followed by the Utilities. Such regulations include the limits that must be fulfilled. As regards disturbances measurements, if the values measured in voltage are above the limits established Utilities are fined. One the other hand, Utilities are able to explore their networks in order to search for disturbing customers. In addition, Utilities are also able to fine customers as long as it is correctly proved that such disturbances are caused by them. Most procedures currently employed to decide whether the disturbances measured at a generic Point of Coupling (PC) are produced by the customer or by the Utility are difficult to carry out in practical cases. The aim of this paper is to analyse and criticise these procedures and propose new, more simplistic methods to assess responsibilities for disturbances. These are related to other methods also applied to different procedures regarding Liberalized Electricity Markets.
Instituto de Investigaciones Tecnológicas para Redes y Equipos Eléctricos (IITREE)
description Since 1997 Utilities in Argentina have been required by the Regulatory Authority (Ente Nacional Regulador de la Electricidad - ENRE) to carry out severe monitoring programs. These monitoring programs involve measuring both voltage level and disturbances - harmonics and flicker - in different points of their networks. There are regulations related to these monitoring programs which set the rules to be followed by the Utilities. Such regulations include the limits that must be fulfilled. As regards disturbances measurements, if the values measured in voltage are above the limits established Utilities are fined. One the other hand, Utilities are able to explore their networks in order to search for disturbing customers. In addition, Utilities are also able to fine customers as long as it is correctly proved that such disturbances are caused by them. Most procedures currently employed to decide whether the disturbances measured at a generic Point of Coupling (PC) are produced by the customer or by the Utility are difficult to carry out in practical cases. The aim of this paper is to analyse and criticise these procedures and propose new, more simplistic methods to assess responsibilities for disturbances. These are related to other methods also applied to different procedures regarding Liberalized Electricity Markets.
publishDate 2005
dc.date.none.fl_str_mv 2005-06
dc.type.none.fl_str_mv info:eu-repo/semantics/conferenceObject
info:eu-repo/semantics/publishedVersion
Objeto de conferencia
http://purl.org/coar/resource_type/c_5794
info:ar-repo/semantics/documentoDeConferencia
format conferenceObject
status_str publishedVersion
dc.identifier.none.fl_str_mv http://sedici.unlp.edu.ar/handle/10915/44675
url http://sedici.unlp.edu.ar/handle/10915/44675
dc.language.none.fl_str_mv eng
language eng
dc.relation.none.fl_str_mv info:eu-repo/semantics/altIdentifier/url/https://app.box.com/s/zmrxj95olbs4ltsqks0kmk1oxrz5hr4z
dc.rights.none.fl_str_mv info:eu-repo/semantics/openAccess
http://creativecommons.org/licenses/by/3.0/
Creative Commons Attribution 3.0 Unported (CC BY 3.0)
eu_rights_str_mv openAccess
rights_invalid_str_mv http://creativecommons.org/licenses/by/3.0/
Creative Commons Attribution 3.0 Unported (CC BY 3.0)
dc.format.none.fl_str_mv application/pdf
dc.source.none.fl_str_mv reponame:SEDICI (UNLP)
instname:Universidad Nacional de La Plata
instacron:UNLP
reponame_str SEDICI (UNLP)
collection SEDICI (UNLP)
instname_str Universidad Nacional de La Plata
instacron_str UNLP
institution UNLP
repository.name.fl_str_mv SEDICI (UNLP) - Universidad Nacional de La Plata
repository.mail.fl_str_mv alira@sedici.unlp.edu.ar
_version_ 1842260200300478464
score 13.13397